Total Inspections
292,759
1/1/2025 – 5/20/2025
Inspection Types
161
Active types
Pass Rate
33%
Overall
Churn Rate
34%
Correction + Fail
Top Inspection Types by Volume
| Type | Total | Pass Rate |
|---|---|---|
| Final | 66,981 | 39% |
| Special/Order Compliance | 23,878 | 2% |
| Rough | 22,883 | 15% |
| Service/Power Release | 10,538 | 45% |
| Smoke Detectors | 10,224 | 56% |
| Floor/Roof Diaphrgm/Shear Wall | 7,721 | 36% |
| SGSOV-Seismic Gas S/O Valve | 6,975 | 49% |
| Interior/Exterior Lathing | 6,114 | 41% |
| CofO Issuance | 6,033 | 47% |
| Footing/Foundation/Slab | 5,951 | 37% |
Highest Correction + Fail Rates
| Type | Churn Rate | Volume |
|---|---|---|
| TCO Plumbing Verification | 100% | 36 |
| TCO Grading Verification | 100% | 16 |
| TCO Sprinkler Verification | 94% | 18 |
| TCO PV Verification | 93% | 14 |
| TCO Heat,Vent,A/C Verification | 92% | 51 |
| TCO Electrical Verification | 88% | 50 |
| Fire Damper Framing | 77% | 320 |
| METHANE-Vent Piping | 76% | 86 |
| Stormwater Drainage | 75% | 314 |
| Water Piping or Service | 72% | 852 |