LA Inspection IntelligencePacific Palisades

1/2/2026 – 1/3/2026 • Updated Jan 12, 2026, 7:24 AM UTC

Total Inspections

63

1/2/2026 – 1/3/2026

Inspection Types

29

Active types

Pass Rate

51%

29 passed

Fail Rate

26%

15 failed

Top Inspection Types by Volume

TypeTotalPass Rate
Final1462%
Service/Power Release1067%
Floor/Roof Diaphrgm/Shear Wall425%
PLUMBING-Rough475%
HVAC-Rough367%
Construction Power(CTS)20%
Footing/Foundation/Slab250%
Grading Verification20%
HVAC-Final250%
BUILDING-Rough-Frame1100%

Highest Fail Rates

TypeFail RateVolume

Results Breakdown (LADBS Categories)

Approved

20

32%

Insp Cancelled

11

17%

Permit Finaled

8

13%

Insp Scheduled

6

10%

Not Ready for Inspection

5

8%

Partial Approval

5

8%

Conditional Approval

2

3%

No Access for Inspection

2

3%

Corrections Issued

1

2%

OK for CofO

1

2%

Data Quality & Transparency

99.99% Coverage

We ingest directly from the official LADBS public dataset. A small number of records (~0.006%) are excluded because they're missing required fields like inspection type or result — these are data quality issues in the source system, not our processing.

Duplicate Tracking

LADBS sometimes records the same inspection multiple times. We detect and track these duplicates using Socrata's unique row IDs, ensuring accurate counts while preserving evidence of source data quality issues.

Source: Los Angeles Department of Building and Safety (LADBS) • Dataset ID: 9w5z-rg2h •View on LA Open Data