Total Inspections
120
7/24/2026 – 7/25/2026
Inspection Types
37
Active types
Pass Rate
51%
33 passed
Fail Rate
28%
18 failed
Change vs Prior Period
Volume
↓ 98.6%vs prior 90 days
Fail Rate
↓ 5.0%vs prior 90 days
Top Movers
No significant changes
Top Inspection Types by Volume
| Type | Total | Pass Rate |
|---|---|---|
| Final | 40 | 74% |
| Service/Power Release | 11 | 73% |
| Rough | 7 | 17% |
| CofO Issuance | 5 | 20% |
| Drywall Nailing | 4 | 0% |
| Insulation | 4 | 0% |
| Pre-Inspection | 4 | 0% |
| Floor/Roof Diaphrgm/Shear Wall | 3 | 0% |
| Public Counter | 3 | 100% |
| PLUMBING-Rough | 2 | 50% |
Highest Fail Rates
| Type | Fail Rate | Volume |
|---|
Results Breakdown (LADBS Categories)
Insp Scheduled
55
46%
Permit Finaled
18
15%
Insp Cancelled
12
10%
Approved
10
8%
Partial Approval
5
4%
Corrections Issued
4
3%
CofO in Progress
4
3%
Not Ready for Inspection
4
3%
Completed
3
3%
CofO Issued
1
1%
Data Quality & Transparency
99.99% Coverage
We ingest directly from the official LADBS public dataset. A small number of records (~0.006%) are excluded because they're missing required fields like inspection type or result — these are data quality issues in the source system, not our processing.
Duplicate Tracking
LADBS sometimes records the same inspection multiple times. We detect and track these duplicates using Socrata's unique row IDs, ensuring accurate counts while preserving evidence of source data quality issues.
Source: Los Angeles Department of Building and Safety (LADBS) • Dataset ID: 9w5z-rg2h •View on LA Open Data