Total Inspections
5,367
5/26/2026 – 7/11/2026
Inspection Types
118
Active types
Pass Rate
43%
1,943 passed
Fail Rate
42%
1,904 failed
Change vs Prior Period
Volume
↓ 28.4%vs prior 60 days
Fail Rate
↓ 0.6%vs prior 60 days
Top Movers
- ↓ 46%Inspection
- ↓ 42%CofO Issuance
- ↓ 41%HVAC-Rough
Top Inspection Types by Volume
| Type | Total | Pass Rate |
|---|---|---|
| Final | 1,482 | 49% |
| Rough | 428 | 11% |
| Service/Power Release | 330 | 48% |
| Smoke Detectors | 210 | 65% |
| Floor/Roof Diaphrgm/Shear Wall | 173 | 46% |
| SGSOV-Seismic Gas S/O Valve | 135 | 47% |
| Inspection | 130 | 100% |
| Wood Frame | 117 | 31% |
| Interior/Exterior Lathing | 116 | 49% |
| BUILDING-Rough-Frame | 114 | 37% |
Highest Fail Rates
| Type | Fail Rate | Volume |
|---|---|---|
| Rough | 69% | 428 |
| PLUMBING-Rough | 55% | 103 |
| CofO Issuance | 52% | 111 |
| ELECTRICAL-Rough | 49% | 101 |
| Footing/Foundation/Slab | 47% | 105 |
| Wood Frame | 45% | 117 |
| Interior/Exterior Lathing | 45% | 116 |
| Floor/Roof Diaphrgm/Shear Wall | 43% | 173 |
| Final | 39% | 1,482 |
| BUILDING-Rough-Frame | 37% | 114 |
Results Breakdown (LADBS Categories)
Approved
1,057
20%
Insp Scheduled
802
15%
Permit Finaled
688
13%
Corrections Issued
650
12%
Insp Cancelled
524
10%
Not Ready for Inspection
414
8%
Partial Approval
405
8%
Partial Inspection
166
3%
Cancelled
101
2%
No Access for Inspection
93
2%
Data Quality & Transparency
99.99% Coverage
We ingest directly from the official LADBS public dataset. A small number of records (~0.006%) are excluded because they're missing required fields like inspection type or result — these are data quality issues in the source system, not our processing.
Duplicate Tracking
LADBS sometimes records the same inspection multiple times. We detect and track these duplicates using Socrata's unique row IDs, ensuring accurate counts while preserving evidence of source data quality issues.
Source: Los Angeles Department of Building and Safety (LADBS) • Dataset ID: 9w5z-rg2h •View on LA Open Data