Total Inspections
129
7/24/2026 – 7/25/2026
Inspection Types
37
Active types
Pass Rate
35%
29 passed
Fail Rate
48%
40 failed
Change vs Prior Period
Volume
↓ 98.3%vs prior 90 days
Fail Rate
↑ 7.8%vs prior 90 days
Top Movers
No significant changes
Top Inspection Types by Volume
| Type | Total | Pass Rate |
|---|---|---|
| Final | 41 | 51% |
| Floor/Roof Diaphrgm/Shear Wall | 10 | 60% |
| Special/Order Compliance | 10 | 0% |
| Rough | 10 | 14% |
| Underground | 7 | 0% |
| BUILDING-Rough-Frame | 4 | 0% |
| Footing/Foundation/Slab | 4 | 67% |
| Green Building Rough | 4 | 0% |
| Verify Sprinkler Sign Off | 4 | 0% |
| Wood Frame | 4 | 0% |
Highest Fail Rates
| Type | Fail Rate | Volume |
|---|
Results Breakdown (LADBS Categories)
Insp Scheduled
46
36%
Permit Finaled
18
14%
Partial Approval
16
12%
Corrections Issued
13
10%
Insp Cancelled
10
8%
Approved
10
8%
Not Ready for Inspection
6
5%
Partial Inspection
2
2%
Cancelled
2
2%
Off-Hour Fees Due
1
1%
Data Quality & Transparency
99.99% Coverage
We ingest directly from the official LADBS public dataset. A small number of records (~0.006%) are excluded because they're missing required fields like inspection type or result — these are data quality issues in the source system, not our processing.
Duplicate Tracking
LADBS sometimes records the same inspection multiple times. We detect and track these duplicates using Socrata's unique row IDs, ensuring accurate counts while preserving evidence of source data quality issues.
Source: Los Angeles Department of Building and Safety (LADBS) • Dataset ID: 9w5z-rg2h •View on LA Open Data