Period: January 13, 2026 – April 13, 2026
During this period, the Los Angeles Department of Building and Safety processed 222,456 inspections across 159 inspection types. The overall pass rate was 44%, with a 42% fail rate.
Note: This pilot brief demonstrates the system's capability to generate executive intelligence from LADBS data. Results are categorized using actual LADBS terminology.
| Inspection Type | Total | Pass Rate | Fail Rate |
|---|---|---|---|
| Final | 56,409 | 48% | 38% |
| Rough | 15,890 | 20% | 68% |
| Service/Power Release | 9,138 | 50% | 34% |
| Smoke Detectors | 8,250 | 64% | 21% |
| Inspection | 6,805 | 99% | 0% |
(Minimum 100 inspections)
| Inspection Type | Fail Rate | Volume | Pass Rate |
|---|---|---|---|
| Stormwater Drainage | 86% | 157 | 4% |
| Deputy Shotcrete | 86% | 539 | 13% |
| Deputy Wood Construction | 84% | 917 | 15% |
| Fire Damper Framing | 83% | 209 | 9% |
| Deputy Reinf. Concrete | 81% | 2,157 | 19% |