Period: October 14, 2025 – January 12, 2026
During this period, the Los Angeles Department of Building and Safety processed 210,151 inspections across 159 inspection types. The overall pass rate was 43%, with a 41% fail rate.
Note: This pilot brief demonstrates the system's capability to generate executive intelligence from LADBS data. Results are categorized using actual LADBS terminology.
| Inspection Type | Total | Pass Rate | Fail Rate |
|---|---|---|---|
| Final | 51,250 | 48% | 38% |
| Rough | 15,355 | 19% | 67% |
| Service/Power Release | 9,332 | 50% | 33% |
| Smoke Detectors | 7,639 | 62% | 22% |
| Floor/Roof Diaphrgm/Shear Wall | 6,383 | 38% | 49% |
(Minimum 100 inspections)
| Inspection Type | Fail Rate | Volume | Pass Rate |
|---|---|---|---|
| Deputy Wood Construction | 86% | 758 | 13% |
| Stormwater Drainage | 85% | 103 | 3% |
| Deputy Pre-Stress Concrete | 84% | 108 | 16% |
| Fire Damper Framing | 80% | 243 | 6% |
| Deputy Other (see comments) | 76% | 275 | 22% |