Period: July 24, 2026 – October 22, 2026
During this period, the Los Angeles Department of Building and Safety processed 3,668 inspections across 132 inspection types. The overall pass rate was 38%, with a 40% fail rate.
Note: This pilot brief demonstrates the system's capability to generate executive intelligence from LADBS data. Results are categorized using actual LADBS terminology.
| Inspection Type | Total | Pass Rate | Fail Rate |
|---|---|---|---|
| Final | 967 | 48% | 34% |
| Rough | 277 | 16% | 61% |
| Service/Power Release | 144 | 46% | 37% |
| Smoke Detectors | 118 | 52% | 22% |
| Floor/Roof Diaphrgm/Shear Wall | 111 | 43% | 32% |
(Minimum 100 inspections)
| Inspection Type | Fail Rate | Volume | Pass Rate |
|---|---|---|---|
| Rough | 61% | 277 | 16% |
| Service/Power Release | 37% | 144 | 46% |
| Final | 34% | 967 | 48% |
| Floor/Roof Diaphrgm/Shear Wall | 32% | 111 | 43% |
| Smoke Detectors | 22% | 118 | 52% |